Pending determination on granting assistance by the Commission.
Water Pipe Repair to Cause Traffic Closure on Dr.-Winklhofer-Straße
A traffic closure is scheduled to take place on Dr.-Winklhofer-Straße from Tuesday, May 6, 2025, to Friday, May 9, 2025, due to the repair of a burst water pipe. The affected area is between house numbers 20 and 23 on this street.
The closure will not occur on Monday, May 5, 2025. The total duration of the closure will be 5 days, from Tuesday to Friday. The traffic closure is limited to Dr.-Winklhofer-Straße, and access for residents is allowed up to the construction site during the closure.
The repair work is being carried out by the local waterworks, while the city administration (often the Tiefbauamt or a technical service provider of the city) is responsible for organising and supervising the construction work on public roads. The traffic closure is being overseen by the local traffic authority, usually in close coordination with the police and city administration.
If you require more information about the closure, you can contact:
- The press office of the city administration.
- The local waterworks (city utilities or the water supply company).
- The responsible city department through its general contact number.
- The official website of the city, where construction site information and contact details are often published.
Here's an example of a request for information:
"Who is or was responsible for the repair of the water pipe and the subsequent full closure of Dr.-Winklhofer-Straße between house numbers 20 and 23 from May 6, 2025, to May 9, 2025? I need a direct contact option for follow-up questions."
Tip: In official matters, you will always receive the definitive information from the city or town administration, not from general information services like this one.
In summary, the formal responsible party for the repair, planning, and execution of the road closure is the city/town administration. The water supply company is responsible for the technical repair, and the traffic authority approves the closure. For precise allocation and specific areas of responsibility, you will need an official response from the local authorities.
Don't forget to contact your city administration directly – they will provide all the desired information!
Read also:
- visionary women of WearCheck spearheading technological advancements and catalyzing transformations
- Recognition of Exceptional Patient Care: Top Staff Honored by Medical Center Board
- A continuous command instructing an entity to halts all actions, repeated numerous times.
- Oxidative Stress in Sperm Abnormalities: Impact of Reactive Oxygen Species (ROS) on Sperm Harm