Skip to content

Traffic is barred from Marschner Bridge

Leipzig's Marschner Bridge to Face Closure in October for Investigation Before Reconstruction

Traffic is barred from crossing Marschner Bridge
Traffic is barred from crossing Marschner Bridge

Traffic is barred from Marschner Bridge

The Leipzig Marschner Bridge will be closed to traffic on October 9, as the structure undergoes necessary investigation and rebuilding. Motorists will be rerouted via Friedrich-Ebert-Straße during the closure, while pedestrians and cyclists will still be able to use the bridge.

The rebuilding project is essential due to the need for investigation and repair, with the exact locations of the two main water pipes underneath the bridge remaining undetermined. The Elster Mulde canal runs underneath the bridge, where the water pipes are located, and no detailed plans for the pipes' locations currently exist.

The location of the pipes needs to be determined before the rebuilding process can commence, as no precise location plans for the pipes currently exist. The search results do not provide information about the companies or groups operating the water pipes under the Marschner Bridge in Leipzig.

Despite the closure, the Leipzig Marschner Bridge rebuilding project will not affect pedestrian or cyclist access during the closure. Motorists will be directed to use Friedrich-Ebert-Straße as an alternate route during the bridge closure.

The necessary task of locating the water pipes must be completed before the bridge rebuilding process can commence. The Leipzig Marschner Bridge investigation and rebuilding are scheduled for October 9. It is important to note that the exact locations of the water pipes underneath the Leipzig Marschner Bridge remain undetermined.

Read also: